琉璃神社

Skip to content

B.C. Hydro calls for new energy sources for the first time in 15 years

But the call for the power comes amidst concerns about the long-term supply
web1_240403-bpd-powercall-power_1
Chris O鈥橰iley, B.C.鈥檚 Hydro president and chief executive officer, and Josie Osborne, B.C.鈥檚 energy, mines and low carbon innovation minister, formally announced B.C. Hydro鈥檚 first call of power in 15 years. (Wolf Depner/News Staff)

Companies can start bidding on B.C. Hydro鈥檚 first callout in 15 years as part of a larger surge to generate more power in B.C., but the province will be importing power again this year amidst concerns about long-term supply.

鈥淲e are facing a lower snowpack as you have seen and that will trigger imports,鈥 Chris O鈥橰iley, B.C.鈥檚 Hydro president and chief executive officer, said Wednesday (April 3) at the legislature, where he joined Josie Osborne, B.C.鈥檚 energyminister, in announcing the formal request-for-proposals. 鈥淭he exact amount (of imports) is actually quite variable鈥o we will see how that turns out.鈥

B.C. Hydro supplies and distributes 95 per cent of power to British Columbians, most of it through hydro-electricity.

鈥淲e manage the costs of that by spreading them over time and that has been a successful technique,鈥 O鈥橰iley said. 鈥淭hat has helped us manage the impact, so we鈥檙e not hitting ratepayers with immediate sharp increases.鈥

He said B.C. Hydro has been able to keep increases below inflation.

鈥淭hat is our goal and we will be able to continue that in the coming years, including the effects of the drought.鈥

Osborne reiterated this commitment.

鈥淲e have made it clear to the (commission) not to see a rise in the rates above the cumulative rate of inflation,鈥 she said.

Requests-for-proposals call for 3,000 gigawatt-hours from independent power producers. B.C. Hydro expects a dozen or so projects totaling between $2.3 and $3.6 billion in capital investments to meet this inaugural goal. Submission deadline is Sept. 16 with B.C. Hydro handing out the first contracts in December 2024. Chosen suppliers must become operational between Oct. 1, 2028 and Oct. 1, 2031.

This call for power comes as forecasts call for a 15 per cent increase in power demand between now and 2030. Factors leading to rising demand include population growth; increased industrial development, including mining; growth in zero-emission vehicles; rising use of fuel pumps in private residences; and more people working from home.

Riley said the inaugural call accounts for about five per cent of B.C. Hydro鈥檚 current supply, equal to about the power needed to power about 270,000 households.

RELATED:

RELATED:

B.C. Hydro expects that most of submissions will be for wind and solar projects, rather than run-of-the-river projects, with geography determining their distribution.

Riley expects the next call for power in 2026, subject to need, with future calls to follow, potentially every two years.

The call for power comes as Site C is expected to go online in 2024 with full completion scheduled in 2025. It will add about eight per cent to B.C. Hydro鈥檚 current supply.

B.C. Hydro also expects to meet demand through energy efficiencies; improved metering allowing consumers with solar panels to sell power back to the grid; optimal time of use rates; and improving existing transmission and generation.

B.C. Hydro is planning to invest $36 billion into what it calls sustaining and extending its system.

Former B.C. Liberal environment minister Barry Penner, who now chairs the Resource Works Energy Futures Initiative, welcomed the expansion, but has also wondered whether it will be enough.

鈥淏C Hydro has already been a net importer of electricity for 4 of the past 12 years, with 20 per or one-fifth of our electricity coming from outside of the province last year,鈥 Penner said in January. 鈥淲e know that Site C alone won鈥檛 be the answer to all our energy requirements, more electricity generation is required.鈥

Electric vehicle targets and proposed shifts away from natural gas for home and commercial heating under Clean BC will have significant impacts on demand, he added. 鈥淭here are outstanding questions on whether we will be able to reach those targets without becoming unsustainably dependent on electricity imports, a significant portion of which come from fossil fuel generation,鈥 he said.

He reiterated these concerns about future supplies in late March.

鈥淚f 90 per cent of vehicles in BC were EVs (electric vehicles) 鈥 which is the required (percentage) for new vehicle sales by 2030 under the CleanBC climate plan 鈥 they will need the equivalent of (two) Site C dams of electricity (in normal water years),鈥 he wrote on social media.



Wolf Depner

About the Author: Wolf Depner

I joined the national team with Black Press Media in 2023 from the Peninsula News Review, where I had reported on Vancouver Island's Saanich Peninsula since 2019.
Read more



(or

琉璃神社

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }
Pop-up banner image