琉璃神社

Skip to content

Delays but no closures at Summerland slide area on long weekend

Crews will continue to work in slide area, with short delays possible
web1_240516-sum-highway-summerland_1
Work continues along the slide area just north of Summerland. During the Victoria Day long weekend, no road closures are planned, although delays of up to 10 minutes are possible. (John Arendt - Summerland Review)

While crews are continuing their work on the slide area on Highway 97 north of Summerland, no road closures are anticipated over the Victoria Day long weekend.

The provincial Ministry of Transportation and Infrastructure said no road closures are scheduled from Friday, May 18 until Tuesday, May 21 to accommodate long weekend traffic.

Construction work will continue and delays of up to 10 minutes may be necessary.

The ministry said delays will occur only during non-peak hours.

Information on the road closure is available through DriveBC and online at .

The road work is being done following a rock slide just north of Summerland in late August, 2023.

Breaking News You Need To Know

Sign up for free account today and start receiving our exclusive newsletters.

Sign Up with google Sign Up with facebook

This site is protected by reCAPTCHA and the Google and apply.

Reset your password

This site is protected by reCAPTCHA and the Google and apply.

A link has been emailed to you - check your inbox.



Don't have an account? Click here to sign up


John Arendt

About the Author: John Arendt

I have worked as a newspaper journalist since 1989 and have been at the Summerland Review since 1994.
Read more



(or

琉璃神社

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }
Pop-up banner image