琉璃神社

Skip to content

'Intermittent full closures' to start on Bruhn Bridge later this month

Exact dates yet to be confirmed by MoTI
bruhn-bridge
Full closures on Highway 1 are expected later in November as construction of the Bruhn Bridge ramps up in Sicamous.

Work on the Bruhn Bridge in Sicamous will ramp up in mid-November causing increasing road closures. 

In a status update for Nov. 4 to 15, the Ministry of Transportation and Infrastructure (MoTI) said the bridge and Highway 1 will be open to traffic, with random delays of up to five minutes. 

On Tuesday, Nov. 12, however, overnight single-lane alternating traffic is scheduled to start, with "intermittent full closures" set to begin later in the month, with exact dates yet to be confirmed. A detour will be available via Highway 97A and B. 

Travellers can access current highway information throughout the project at . 



About the Author: Heather Black

Read more



(or

琉璃神社

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }
Pop-up banner image